Skip to main content

Author: Bill Mulholland

Bill Mulholland is the owner of ARC Relocation, a company that relocates thousands of employees annually, to every state in the United States, and more than 90 foreign countries, for organizations like DHL, Overstock.com, GNC, and the U.S. Government. Bill owns a real estate brokerage servicing Maryland, Virgina and Washington DC as well as a title company servicing Maryland, Virginia, Washington DC and Florida
Tablet showing an AI-powered moving quote app with instant price estimate

Agoyu Patent Awarded for AI-Powered Moving Quote Technology

The moving industry runs on guesswork. In-home estimates, phone tag, quotes that mysteriously climb once the truck shows up. The new Agoyu patent protects the system we built to replace all of that, an AI that watches a short video of your home and returns real, competitive quotes in minutes.

This month, the U.S. Patent and Trademark Office recognized that work as genuinely new.

What the patent covers

The Agoyu patent (U.S. Patent No. 12,602,645 B2) protects the full system behind how we generate moving quotes, including:

  • AI that identifies items from video and estimates their weight, size, and quantity
  • Inventory data matched against licensed movers’ live pricing to generate real cost estimates
  • A reverse-marketplace bidding feature that lets movers compete for your business
  • Smart-contract-style booking records that document every term of your move

Put simply, it’s the legal backbone for an entirely new way to price a move.

Why it matters if you’re moving

A patent confirms what our customers already feel when they open the app. The pricing, matching, and transparency Agoyu delivers aren’t easily copied. You’re using the only system of its kind that can turn a phone video into 25 competitive mover quotes in three minutes, with no sales calls, no bait-and-switch pricing, and no scheduling an in-home visit just to find out what your move costs.

Why it matters for the industry

Moving has largely looked the same since the 1930s. Our founder, Bill Mulholland, spent decades inside that industry before building Agoyu to flip the dynamic.

“The way people get quotes for their moves has remained largely the same for decades. At Agoyu, we’re changing that by offering instant, AI-powered quotes. Our transparent pricing helps consumers avoid hidden costs, while also helping trusted movers reduce overhead and wasted labor on in-person estimates that may never turn into business.” – Bill Mulholland, Founder & CEO, Agoyu

The Agoyu patent makes that vision defensible. It also clears the runway for what’s next: more AI capability, wider international coverage, and better tools for the movers doing this work the right way.

Read the Agoyu patent

You can view the full filing for U.S. Patent No. 12,602,645 B2 on [Google Patents / USPTO].

Ready to see what your move would actually cost?

Defense Secretary Pete Hegseth speaking about military PPM reimbursement changes

Military PPM Reimbursement Rates: What Happened to the 130% Rate?

If you’re planning a military PCS move and considering a Personally Procured Move (PPM), you may have come across references to a 130% military PPM reimbursement rate. That temporary increase was real—but it was part of an emergency response to problems with the military household goods moving system in 2025.

Defense Secretary Pete Hegseth announced the increased reimbursement as military families faced delayed shipments, mover shortages, damaged belongings, and widespread problems with the Global Household Goods Contract (GHC). The temporary policy gave service members a stronger financial incentive to arrange their own moves rather than rely entirely on the government-managed system.

So what happened to the 130% rate, what is the military PPM reimbursement rate now, and can you still save money by arranging your own PCS move? Here’s what military families need to know.

Why Did the Military PPM Reimbursement Rate Increase to 130%?

In 2025, the Defense Department temporarily increased PPM reimbursement from 100% to 130% of the applicable Global Household Goods Contract rate. The increase was designed to help military families arrange their own moves during a period when the government’s new household goods moving system was struggling to meet demand.

Hegseth acknowledged that existing reimbursement levels weren’t always sufficient to cover what military families actually had to pay when arranging their own moves. At the same time, moving companies were struggling with rates and capacity under the new system, contributing to a shortage of movers willing or able to accept military shipments.

The 130% reimbursement was therefore a temporary solution: give service members more financial flexibility to procure their own transportation while the Defense Department addressed broader problems with the PCS moving system.

Importantly, the 130% reimbursement was a temporary 2025 policy—not the standard military PPM reimbursement rate today.

Why Military Families Choose PPM Moves

The problems that led to the 2025 reimbursement increase ran deep. Through the first quarter of 2025, only about 25% of domestic moves were handled under the new GHC contract. Even worse, 1,600 of those moves had to be turned back to the legacy system because HomeSafe couldn’t find moving companies to handle them. The Army ultimately stopped booking new moves under the contract, directing bases to return to the legacy system “until further notice.”

A Personally Procured Move gives service members another option. Instead of having the government arrange the entire household goods shipment, you take responsibility for some or all of the move yourself. That can mean renting a truck and doing the work yourself, hiring a professional moving company, or using a combination of services.

The biggest advantage is control. You can choose your mover, compare prices, coordinate your schedule, and decide how much of the moving process you want to handle yourself.

You may also be able to come out ahead financially. Your PPM payment is based on the government’s calculated cost for your authorized move rather than simply reimbursing whatever amount you spend. If you complete the move for less than your authorized payment, you may retain the difference, subject to applicable taxes and PPM rules.

What Is the Military PPM Reimbursement Rate Now?

The temporary 130% reimbursement increase was specific to the 2025 PCS moving crisis and should not be confused with the standard PPM reimbursement structure today.

Under current military PPM rules, a member-elected Personally Procured Move generally pays 100% of the Government Constructed Cost (GCC) for transporting your authorized household goods, based on your actual shipment weight up to your authorized weight entitlement.

That does not mean the government simply reimburses 100% of whatever a moving company charges you. Your authorized PPM payment is calculated using the government’s estimated cost of moving your shipment, taking into account factors such as weight, origin and destination, and your authorized entitlement.

If you complete the move for less than your authorized PPM payment, you may be able to keep the difference, subject to applicable taxes and PPM rules. Before committing to a PPM, get an official estimate from your transportation office so you understand your authorized payment and documentation requirements.

Finding the Right Mover Just Got Easier

For service members choosing a PPM, finding the right mover can make a significant difference—not just in the quality of the move, but in what the move ultimately costs. Comparing qualified movers and competitive pricing can help you evaluate your options against your authorized PPM payment.

Agoyu simplifies that process. Instead of spending hours researching movers, making phone calls, and scheduling multiple estimates, you can use Agoyu’s AI-powered video survey to scan the belongings in your home and build an accurate moving inventory.

From there, Agoyu lets you compare competitive quotes from vetted moving companies for your specific move. That gives you a clearer picture of your actual moving costs—and a much easier way to determine which mover offers the right combination of price, service, and reliability.

For a military PPM, that comparison can be especially valuable. The less you spend completing your move relative to your authorized PPM payment, the greater your potential financial benefit, while still giving you control over who handles your belongings.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


What the 2025 PPM Changes Mean Today

Hegseth's 2025 PCS directives were significant for reasons beyond the temporary reimbursement increase. They represented an acknowledgment at the highest levels of the Defense Department that military families needed better options when the traditional household goods system couldn't reliably deliver.

The Defense Department also began reviewing military PPM rates, accountability, capacity, and the broader PCS process. The temporary 130% reimbursement should therefore be understood as one part of a larger effort to address shortcomings in military household goods transportation.

For service members planning a move today, the larger lesson remains relevant: you don't necessarily have to accept a one-size-fits-all moving solution. A PPM can give you greater control over your mover, timing, costs, and overall relocation experience.

Making Your PPM Work for You

A successful Personally Procured Move starts before the first box is packed. As soon as you receive PCS orders, talk with your installation transportation office about your PPM options, authorized weight allowance, estimated government cost, and documentation requirements.

From there, compare your options carefully. Depending on your move, you may rent equipment and move yourself, hire labor for part of the process, hire a professional moving company, or combine several services.

Keep careful records throughout the move. Weight tickets, receipts, invoices, contracts, and other required documentation can affect your final reimbursement claim.

If you're hiring professional movers, don't automatically choose the lowest estimate. Compare what each quote includes, verify the mover's credentials, understand valuation or insurance coverage, and watch for estimates that could increase substantially after your belongings are loaded.

This is where technology can make a PPM considerably easier. Agoyu uses an AI-powered video survey to build an inventory of what you're moving and allows you to compare pricing from vetted movers without scheduling multiple in-home estimates or repeatedly describing the same shipment.

The goal isn't simply to find the cheapest mover. It's to find the best combination of price, reliability, service, and control while staying within the economics of your authorized PPM payment.

The Bottom Line on Military PPM Reimbursement

The 130% military PPM reimbursement rate was an extraordinary response to an extraordinary period in the military household goods moving system. It gave service members additional financial flexibility during part of the 2025 PCS season, but it should not be treated as the standard reimbursement rate for current moves.

If you're considering a PPM today, start by getting your official reimbursement estimate and requirements from your transportation office. Then compare what it would actually cost to complete the move yourself or hire a professional mover.

That's where a PPM can still be compelling. Greater control over your mover, schedule, and costs can make the PCS process more predictable—and competitive moving quotes can help you understand whether a Personally Procured Move makes financial sense for your family.

Agoyu makes that comparison easier by using AI to inventory your household goods and connect you with vetted movers competing for your move. Instead of calling movers one at a time, you can compare your options and make an informed decision based on your actual shipment.

The 130% reimbursement may have been temporary. The ability to take greater control of your PCS move isn't.

Uniformed movers loading boxes into a truck outside a house

The 8 Best Cheap Moving Companies for Tight Budgets

Moving can be physically, mentally, and even financially draining. Therefore, it is helpful to use a cheap moving company that can efficiently help with your relocation without breaking the bank. 

These cheap moving companies can help make the process of your move much easier while also giving you the satisfaction of knowing you do not have to plan a move alone. 

Get a Quick Quote from a Cheap Moving Company in Your Area:

When searching for the best cheap moving company, it’s important to remember that there’s no single right answer. The best moving company for you depends on factors like where you’re moving to and from, the time of year, and the size of your household goods. That’s why Agoyu uses AI technology to instantly analyze your moving details and match you with the best movers and lowest prices for your specific situation. With Agoyu, you can quickly compare movers, get accurate quotes, and choose the option that truly fits your needs.

1. Mayflower Transit

Pros:

  • No deposit required without upfront costs, making it easier to manage your budget
  • Binding quotes available to lock in your price for long-distance moves, eliminating surprise charges at delivery
  • Nationwide coverage serving all 50 states with nearly 100 years of industry experience

Cons:

  • Some customers report varying levels of professionalism between different crews
  • Getting your initial estimate can take longer than expected

Mayflower Transit stands out as one of the most budget-friendly options for customers who need reliable moving services without breaking the bank. With nearly a century in business, they’ve built a solid foundation of affordability through features like price matching, binding quotes, and zero deposit requirements.

Their nationwide reach means you can count on them whether you’re moving across town or across the country, and their full-service options cover everything from packing to vehicle shipping.

While Mayflower delivers on value, the experience can be hit-or-miss depending on your specific crew and location. Some customers rave about courteous, professional service, while others report delays and communication issues.

The quote process also tends to drag longer than competitors, which can be frustrating when you’re trying to plan your move quickly. Despite these drawbacks, Mayflower remains a smart choice for budget-conscious movers who prioritize locked-in pricing and comprehensive service options over premium customer experience.

allied international moving

2. Allied Moving

Pros

  • Allows you to pick and choose what services you want
  • Offers excellent vehicle coverage
  • Provides container moving services
  • Generous cancellation policy

Cons

  • Customer service is limited when outside of typical business hours
  • Do not provide online moving quotes

Allied Van Lines is one of the best cheap moving companies for your move. They offer various moving options, ranging from full-service options to DIY support. This allows you to create the best moving package for your specific needs, budget, and move size. 

Allied Van Lines has over 90 years of experience in the moving business and has mastered handling long-distance, local, and international moves. They offer container moving services through a service called Allied Express. 

While they offer 24-hour customer service, it can be challenging to contact a customer support representative outside of typical business hours. They also do not provide online moving quotes but will discuss quotes and details about your move with you over the phone.

3. Safe Ship Moving Services

Pros:

  • Affordable pricing
  • Fast and efficient service
  • Careful handling of items

Cons:

  • Limited coverage area
  • Occasional communication gaps

Safe Ship Moving Services offers a budget-friendly solution for those looking to relocate without breaking the bank. Their team of movers works quickly and efficiently, ensuring that your belongings are transported to your new home in a timely manner.

With a focus on careful handling, Safe Ship minimizes the risk of damage to your items during the move.

However, their coverage area is somewhat limited, which may be an issue for some customers. Additionally, there have been instances of communication gaps between the company and clients, leading to minor inconveniences.

Despite these drawbacks, Safe Ship Moving Services remains a solid choice for those prioritizing affordability and speed in their moving experience.

4. Allegiance Moving and Storage

Pros:

  • Extensive experience in the industry
  • Wide range of moving services
  • Climate-controlled storage facilities

Cons:

  • Some reports of hidden fees
  • Occasional scheduling conflicts

Allegiance Moving and Storage is a well-established company that brings years of experience to the table. They offer a comprehensive range of moving services, catering to the diverse needs of their clients.

Whether you require local or long-distance moving, packing, or storage solutions, Allegiance has you covered. Their climate-controlled storage facilities provide a secure option for those needing to store their belongings during the moving process.

However, some customers have reported instances of hidden fees, which can be frustrating and add unexpected costs to the move. Additionally, there have been occasional scheduling conflicts, leading to minor delays.

Despite these drawbacks, Allegiance Moving and Storage remains a solid choice for those seeking a full-service moving company with extensive experience and a wide array of options.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


atlas international moving

5. Atlas Van Lines

Pros

  • Established reputation with 95+ years in business
  • Extensive network coverage across North America
  • Professional service with strict quality standards
  • Comprehensive moving solutions including specialty services

Cons

  • Premium pricing typically 15-25% above competitors
  • May include unnecessary service costs for budget-conscious customers
  • Large corporate overhead reflected in quotes
  • Limited flexibility for cost-cutting options

As one of North America's largest van lines, Atlas Van Lines delivers professional moving services but at a premium price point. Their nearly century-long track record and extensive network of 350+ movers provide reliability and comprehensive coverage, though budget-conscious customers will pay significantly more than with regional alternatives.

Atlas Van Lines' focus on quality over cost makes them better suited for corporate relocations or customers who prioritize service excellence over savings. While their strict standards ensure professional handling, the premium pricing structure typically runs 15-25% higher than mid-tier competitors.

For budget movers seeking basic interstate relocation services, Atlas Van Lines may offer more comprehensive solutions than needed at prices that exceed many customers' moving budgets. Consider regional carriers or hybrid options like U-Pack for substantial cost savings while maintaining professional service standards.

international van lines

6. International Van Lines

Pros

  • Affordable rates
  • Available in all 50 US states
  • Offers multiple protection plans
  • Provides vehicle relocation services

Cons

  • Outsources to a third-party service in Washington, Oregon, Montana, and Utah

International Van Lines is one of the best full-service and inexpensive moving companies. This moving company does all the work to make the process easier for you. They will load all your belongings onto their truck, drive them to your new home, and unload everything. 

International Van Lines will install your electronics and reassemble your furniture for an additional cost. They offer various services, including packing and unpacking, storage services, car shipping, junk removal, local moves, cross-country moves, and international delivery. 

You can mix and match their services based on your specific needs. International Van Lines offers multiple protection plans to ensure your goods make it safely to your new destination. If you are interested in scheduling your move with International Van Lines, you can get an instant online quote. 

A 25 percent deposit is required to schedule your move, and you have up to 48 hours before your planned move to cancel for free.

7. PODS

Pros

  • Flexible moving options
  • Online reservations and flexible delivery
  • Transparent pricing
  • Safe and secure transport

Cons

  • Limited coverage
  • Scheduling delivery is all on you

PODS is a popular and affordable moving and storage company that offers flexible options for customers looking to relocate or store their belongings.

The company's biggest advantage is its flexibility, offering customers a range of container sizes and the option to store their container at a PODS facility or have it delivered to their new location. PODS is also convenient, with online reservations, flexible delivery and pickup schedules, and the ability to pack and unpack at your own pace.

Additionally, the company's transparent pricing and weather-resistant containers make it a safe and secure option for customers.

Overall, PODS is a great option for those looking for an affordable and flexible moving and storage solution, with the convenience of online reservations and safe and secure storage.

north american international moving

8. North American Moving Services

Pros

  • Experienced and reliable
  • Wide range of services
  • Provides a guaranteed delivery date and time frame
  • Good for military moves

Cons

  • Potential for delays
  • No shipment tracking

North American Moving Services is a moving company that offers a variety of relocation services for both residential and commercial customers. Their services include local, long-distance, and international moving, as well as packing, unpacking, and storage options.

The company has been in business for over 85 years and has a network of over 500 agent locations throughout the United States.

Many customers have reported positive experiences with North American Moving Services, praising the company's professionalism, attention to detail, and excellent customer service. The company's commitment to ensuring the safe and timely delivery of their customers' belongings is highly appreciated.

Frequently Asked Questions Regarding Cheap Moving Companies

What are the 5 biggest risks of hiring cheap movers?

  1. Lack of insurance: Cheap movers may not have adequate insurance to cover any damage or loss that may occur during the move.
  2. Inexperience: Movers who charge low rates may be inexperienced and lack the knowledge and skills needed to safely and efficiently move your belongings.
  3. Unreliability: Cheap movers may be more likely to cancel or postpone your move at the last minute, or not show up at all.
  4. Damage: Movers who are not properly trained or equipped may damage your furniture and belongings during the move.
  5. Scams: Some cheap moving companies may be fraudulent, and may take your deposit without providing the promised moving services, or may hold your belongings for ransom.

It is important to be aware of these potential risks, and thoroughly research any moving company you are considering hiring to ensure that they are reputable, reliable, and properly insured.

What is the cheapest day to hire movers?

The cheapest day to hire movers is typically during the middle of the week, such as a Wednesday or Thursday, as opposed to the weekend. This is because demand for moving services is generally lower during the week, and movers may be more willing to offer discounted rates to fill open slots in their schedule. Additionally, some moving companies may have special deals or discounts for weekday moves. Keep in mind, however, that even during the week, prices may vary depending on location, company policies and the time of year. It is always best to compare different moving companies and get a written estimate before making your decision.

How do I find cheap movers, or save the most money possible on my move?

Here are a few ways to find cheap movers:

  1. Compare prices: Get quotes from multiple moving companies and compare their prices and services. Be sure to also ask about any additional costs, such as for packing materials or for moving special items, so that you can make an accurate comparison.
  2. Look for discounts: Some moving companies offer discounts for seniors, students, military personnel, or for booking during certain times of the year. Ask the companies if they have any current deals or promotions you could use.
  3. Ask for referrals: Ask friends, family, or co-workers if they have any recommendations for affordable movers in your area.
  4. Check online reviews: Look for reviews of different moving companies on websites like Yelp, Angie's List, or the Better Business Bureau. Pay attention to companies that have consistently positive reviews and a high rating
  5. Packing your own: Pack your own belongings as some moving company will offer lower rates if you do your own packing.
  6. Downsize your stuff: The less you have, the less the company will have to move, so consider selling or donating items that you don't need or use to decrease the cost of moving.
  7. Choose a less busy moving season: Prices for moving services may be higher during peak moving season ( typically May-September ) or holiday weeks, so consider moving during the off-season or mid-month when demand is lower.
  8. Rent a moving truck instead of hiring professional movers: Renting a truck and moving your items yourself is often cheaper than hiring professional movers, but keep in mind that this can be more labor-intensive and may not be the best option if you have a lot of heavy or fragile items to move.

It's important to remember that you should never compromise on the quality or reputation of a company, just to get a lower price. Be sure to thoroughly research and compare different companies before making a decision.

How much does it cost to pay a mover per hour?

You can expect to pay between $50 and $80 per hour to hire a professional moving company. It depends on the services you choose and the location of your move. It can even cost less if you choose DIY movers such as U-Pack.

How far in advance should I plan my move?

You should try your best to plan for your move as much as you can, and there is no set amount of time to plan your move. April through October are some of the busiest months for moving companies, especially on Saturdays. 

Therefore, schedule your move as soon as possible to lock in your moving date. If you plan your move during the off-season, it may be quicker to schedule it.

Should I tip the movers?

You are not expected to tip your movers since you are already paying for their services. However, you can undoubtedly tip them if highly impressed with their services. A typical rate to tip your movers is about $6 to $12 per hour that they helped you with your move.

What are the benefits of using a moving company?

The primary benefit of using a moving company is that your move is more reliable and efficient without needing to do all the hard work yourself. In addition, many moving companies offer other services, like vehicle shipping and container services, to help make it even more convenient.

What is the most inexpensive way to move?

The most inexpensive way to move is to use a container moving company. Moving companies that offer container moving services are typically cheaper than full-service movers, possibly by thousands of dollars. 

However, many full-service movers do provide container services and have cheap packages available depending on your move. Moving containers are typically more affordable than renting a truck if you are moving from coast to coast.

Do you pay movers before or after?

You typically pay your movers after the move, but many companies require a deposit down to schedule. 

If a moving company asks for full payment before your move, that could indicate that they are untrustworthy. An honest moving company will ask for payment once the move is completed.

Final Thoughts

Using a cheap moving company for your relocation can provide many benefits. The important thing to remember is that “cheap” doesn’t mean “bad.” But, you’ll still want to carefully choose an affordable moving company. 

The Agoyu app can help you find affordable moving companies to assist you with your move. 

Agoyu can help you compare movers’ prices and customer reviews to help you find the cheapest moving company.

Delivery truck and movers from a professional moving company

The Best Moving Companies: Choosing The Right Moving Company

If you’re planning a move; whether it’s across town or across the country, you will need the best moving company to help you. Choosing between the various options is difficult and each company will try and convince you that they’re the best. 

Go through the reviews below of each company and decide which is the best option for you based on the services they provide. 

Best Moving Companies: Top Picks

Since moving is so stressful, we put together a list of the best rated moving companies to help you with your move, while meeting your budget and needs. Our ratings explain what type of move these companies assist with, their pros and cons, if they offer moving quotes, and an explanation of why we chose them.

international van lines

International Van Lines 

Best Overall

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros:

  • Has a generous cancellation period of at least 48 hours prior to scheduled move with a full refund of your deposit
  • Rated the Best in Customer Service awards in 2021
  • Offer one month of free storage 
  • Offer interstate, local, and international moving.

Cons:

  • There is no container moving service 
  • A deposit is required in order to schedule your move.

Why We Chose Them

Our top choice for an international mover is International Van Lines. Newsweek rated International Van Lines as best in customer service in 2021, and it is easy to understand why. 

They offer full service packing, shipment tracking, transportation of your vehicles, moving supplies, many insurance options, and online quotes. To reserve a date for your move, you will need to put a 25 percent deposit down. If you need to cancel your move for some reason, you have the ability to do so up until 48 hours before your scheduled move. 

united van lines

United Van Lines

Best Full-Service

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros: 

  • Online tracking
  • Good insurance options 
  • Great cancellation policy
  • Popular for corporate moving

Cons: 

  • Pricey
  • No container service

Why We Chose Them

United Van Lines is a highly recognized name when it comes to moving, mostly because this moving company has been around since the beginning of the 1920s and is one of the best moving companies. They are widely known for their corporate relocation services with custom packages laid out for each company and their packages explain their extensive insurance options.

As an established moving company, United Van Lines charges more than others because of its experience and expertise. If you are expecting help planning your move, be prepared to pay an additional fee as it is not included in their original pricing. 

Their website is easy to use and features how to track your shipment on the first page. The main reason we like United Van Lines is because of their free cancellation policy which is valid right up until services begin, and there is no deposit required.

american van lines

American Van Lines 

Most Reputable Name

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros: 

  • Great at moving delicate items and antiques
  • Honest customer reviews
  • Good for corporate moving.

Cons: 

  • Do not offer container moving
  • A deposit is necessary to schedule your move 
  • Restrictive cancellation policy.

Why We Chose Them

American Van Lines are known best for being corporate relocation experts. In addition to being great at corporate moving, American Van Lines is great for military moves as they understand the timelines can be strict and they will efficiently execute your military move in a short amount of time. They offer upfront pricing, full-service packing, the ability to receive an online quote, shipping of your vehicles, and moving supplies. 

To schedule your move, you will need to put a deposit down. Their cancelation policy is not the best, as you only have three days after you sign the contract to cancel for free. If you cancel after three days, it will not be free cancellation. 

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


allied van lines

Allied Van Lines 

Best for Moving Vehicles

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros:

  • Offers container moving service
  • Has a generous cancelation policy
  • Offers great insurance options

Cons:

  • The price of local moving can be expensive depending on your budget

Why We Chose Them

Allied Van Lines has a multitude of factors that makes them one of the best moving companies. We love that they have excellent customer reviews, and offers container moving services. Allied Van Lines has excellent insurance coverage options, is one of the most trusted interstate moving companies, and has a great cancellation policy. Their cancelation policy allows you to cancel free of charge as long as the movers have not started yet. 

You do not need to put down a deposit to reserve your move, and they offer full service packing, moving supplies, moving quotes, tracking of your belongings, and vehicle shipping. Allied Van Lines has experienced drivers to help with the moving of your vehicle, and will ensure it gets from point A to point B safely.

safeway

Safeway Moving Systems

Best Carrier

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros:

  • Great for those moving to a condo or HOA
  • Every move includes packing services
  • All moves include 30 days of free storage

Cons:

  • Communication can be difficult since you will not be able to contact your moving carrier until close to your move
  • There is no information about online pricing

Why We Chose Them

Safeway Moving Systems, a company based out of Chicago, is our favorite choice for best moving broker. Safeway connects you to the actual moving carriers that will perform your move, and gives you access to a large network of nationwide movers. Since Safeway just connects you to your actual movers, you will not be in direct contact with your movers until later in the moving process. 

Safeway is one of the best moving companies for those who are moving to a place with a HOA or condo. The moving companies that Safeway partners with have additional required licenses and insurance certificates. Many HOAs and condo associations require movers to hold $1,000,000 in liability insurance, as opposed to standard moving companies who usually carry $750,000 of liability insurance. 

Safeway is authorized by the United States government to broker both long distance and local moves in all 50 states. Safeway Moving Systems offers a variety of services, like packing and unpacking, storage solutions, and pad and shrink wrapping. You will have to pay a deposit to Safeway on the day of your move.

mayflower

Mayflower

Best for Large Moves

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros:

  • Offers digital checklists
  • No deposit is required
  • Great for large moves
  • Can do debris removal

Cons:

  • Can be expensive depending on your budget
  • No container moving service

Why We Chose Them

Mayflower has over 90 years of experience in the moving industry, and is one of the best moving companies used for large moves. We like that Mayflower does not require you to put down a deposit to book a move, and has a portal you can log in to help keep track of your moving process. 

With the MyMayflower portal, you can create a digital moving checklist, check the status of your move, and have your moving contacts saved. Mayflower handles a multitude of moving services, usually cross-country and international moves. However, they also can provide moving services within your state and do provide local moving services through independent agents. 

Mayflower can move your vehicle no matter what the distance, and is available through a network of 200 agencies affiliated with Mayflower across the country. Keep in mind that Mayflower can seem expensive, but this is because they typically do large moves which require a lot of effort on their part. 

If you are moving internationally, Mayflower can assist with your move in more than 150 countries and is one of the greatest long-distance moving companies.

atlas

Atlas Van Lines

Best for Custom Moving Services

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros:

  • Website is helpful
  • Great customer reviews
  • No deposit is required

Cons:

  • No container moving services
  • Restrictive cancellation policy

Why We Chose Them

Atlas Van Lines is great for custom moving services because they make your move simple, whether it is a local move, international move, or cross country move. Their website is helpful because it provides tools to help with organization, can provide information on tracking, and offers upfront quotes when requested. 

Atlas Van Lines offers storage, will move your vehicles, offers full service packing options, and good insurance options. You do not need to put down a deposit when scheduling your move, but they do have a restrictive cancellation policy. Atlas will allow you to cancel for free, but only within three days of signing your contract.

northamerican

North American Van Lines

Best for Warranty and Claims

  • Local Moving? Yes
  • Interstate Moving? Yes
  • International Moving? Yes

Pros:

  • Offers 24 hour customer service
  • Container moving is available
  • Great for commercial and corporate relocation
  • Great for warranty and claims

Cons:

  • Restrictive cancelation policy
  • Few insurance options
  • Can be expensive

Why We Chose Them

We chose North American Van Lines as one of the best moving companies because they have a few features that stand out. They have a container moving option, called Blue Express, that separates them from a lot of competitors since many do not offer container moving services. 

They have a 24-hour customer service line with over 500 agents that will happily take your call whenever you need assistance. Their customer service line is what makes the best for warranty and claims. 

North American Van Lines offers full packing services, online quotes, moving supplies, shipment of your vehicles, and shipment tracking. However, the cost of moving tends to be expensive for smaller moves. A short distance move for a one-bedroom home can cost you as much as $3,100, which is why we recommend them for commercial and corporate relocation.

How to Choose the Best Moving Company 

When searching for the best moving companies, you should take the extra time to look into their reviews. Customer reviews are helpful because they will give you some insight on what others have been through with the company and their personal experience. Search the moving company’s website for a free quote, so you have an understanding of how much your move will cost.

Do not settle for the first estimate you receive when choosing a moving company. Take your time and research it a bit just to be sure you are happy with the price. If you are planning to move a mobile home, be sure your moving company has a good insurance policy and that your movers are licensed and insured, and are willing to accommodate your needs. 

How Much Does a Moving Company Cost

The best moving companies can cost a variety of different prices depending on how large your move is and where you are moving to. For example, if you are a family of four moving from Florida to Texas, you can expect to pay between $2,000 and $4,000. 

On average, the cost of a moving company can range anywhere from $800 to $5,700 based on the size of your move. To find a moving company within your budget, check out the Agoyu moving app so you can compare the prices of different movers near you.

Final Tips for Moving

These tips for moving will help make your move more simple.

  • Have a set budget
  • Create a moving checklist
  • Start packing early
  • Invest in quality boxes for moving
  • Label your boxes
  • Pack your dishes and glasses using bubble wrap or packing paper
  • Know the pros and cons of hiring professional moving companies

Most importantly, make sure you hire only the most qualified and reputable moving company. If you’re planning a corporate or business move, ARC Relocation can help you relocate your business and your employees. 

Remember that you’re in the driver’s seat when you hire a moving company so study up and choose wisely! 

Movers covering a sofa with a protective blanket during a home move

Residential Moving Services: Finding the Right Residential Moving Companies

Chances are if you’re relocating you’ll want to hire residential moving services to help you with the move. The problem is, there are so many companies to choose from and they’re certainly not all equal. 

In this guide, we want to explain the advantages of using a tool like Agoyu to help you find only the best and most qualified household movers in your area. 

5 Steps of Home Moving

The residential moving company that you choose is responsible for a lot of your moving needs, such as providing you with cost estimation and explaining your moving service options. Your moving company does more than just loading, unloading, and driving a moving truck. They do more than you might realize to ensure your belongings safely make it from start to finish. 

1. Prepare 

Your professional movers will explain their residential moving services to you so you have a good understanding of how the process works. Your movers will provide you with a cost estimate and then will take note of everything in your home. This will allow them to inform you ahead of time if there are any items they cannot move and let you know if any of your items have special requirements. 

2. Take Inventory

Your residential moving driver will have a comprehensive Inventory and Condition Report of all the items you are moving. Your professional movers will mark down if any items that are being moved have any damage, to provide proof that they did not cause the damage. When your movers are preparing inventory, you should accompany them so you can voice any concerns you might have regarding the handling of your furniture and belongings.

Using a moving app for moving furniture like Agoyu can help you be in charge of your move. Agoyu allows you to calculate the weight of your furniture, which will be helpful when comparing the prices of professional movers. You will be able to see customer reviews, compare prices, and contact a professional mover for free.

When your movers complete their inventory, you will be asked to sign the inventory. You will need to sign the inventory to acknowledge that you understand the condition of your furniture before the move. You and your driver will both have a copy of this report.

Besides having to sign an Inventory and Condition Report, you will also be asked to sign a bill of lading. This contract authorizes your moving company to transport your belongings and that you agree to pay for their services. The bill of lading confirms your moving services, the schedule of pick up and delivery, and whether or not you chose a protection plan. 

3. Packing 

Your residential moving services driver offers more services than driving the moving truck and moving your boxes. Your professional movers will ensure that your belongings are covered as a form of protection. Sometimes knowing what to pack first is one of the most difficult parts of the moving process. Your movers will be able to help pack your belongings and wrap anything that is fragile in packing paper. 

Depending on which moving company you choose, your professional movers might even label your boxes for you if you haven’t already done so. They will ensure your boxes are carefully loaded onto the truck and safely delivered to your destination. 

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


4. Delivery 

If you are moving a long distance, like moving to Texas from Florida, it is essential to contact your moving company as soon as you arrive in your new home. This will allow your professional movers to confirm your delivery arrangements. When your belongings arrive, give your movers a copy of the floor plan you have in mind. 

If you do not have a floor plan set up, just let your professional movers know where you would like everything. Your overs will reassemble your furniture when it is brought in. If anything seems damaged or in a different condition from before the move, let your movers know as soon as possible. 

5. Unpacking 

If you choose an unpacking service through your professional movers, your movers will assist in unpacking your boxes after delivery. This might be especially helpful if you have a cross country move and are exhausted from the move. Your movers will remove any moving supplies or packing materials. If you choose to unpack yourself, it will be your responsibility to discard any empty moving boxes, packing materials, and moving supplies.

Loaded moving truck backed up to a house with furniture and boxes inside
Residential moving services can handle the loading and transportation of furniture, boxes, and household belongings to your new home.

Choosing the Best Residential Moving Services 

There are many factors that go into choosing a moving company to help you with your residential move.

Reputation

Moving companies with many years of residential moving services goes a long way in customer satisfaction. Moving companies with great reputations will ensure you have a good moving experience and that your belongings are safely packed, transported, and delivered.

Reviews

Before choosing a professional mover, check out their online reviews. Reviews often state former customers' opinions of a particular moving company, which will be helpful when deciding which company to choose for your move.

Experience

Professional movers with many years of experience are likely to make your move a smooth one. Moving your belongings is something experienced movers take seriously. Choosing an experienced moving company will help set you up to have an easy going move.

Services Offered

You should be aware of the services different moving companies offer before choosing your movers. If you want help with unpacking, for example, be sure to choose a professional moving company who offers unpacking services. Not every moving company offers the same services.

Cost

The cost of different residential moving services vary. The cost will greatly depend on what services you are opting for with your move, how large of a move you have, and what your movers will be packing and unpacking. 

One of the best moving apps, Agoyu, can help you find professional movers within your price range. This will make choosing a residential mover a lot simpler.

Final Thoughts

When all is said and done, hiring the right residential moving services can make or break your move. Literally. 

With Agoyu, you’re able to quickly and easily get a quote online from local moving companies in your area. These companies are pre-vetted, experienced, and licensed. Give Agoyu a try today and see the difference!

WPBF 25 news report about a victim of a moving scam

Agoyu Featured on WPBF 25: How AI Can Protect You from Moving Scams

Agoyu was recently featured on ABC WPBF News 25, spotlighting a troubling but all-too common issue facing people moving today — moving company scams that lure customers with low quotes and then spring huge surprise charges on moving day. The investigative segment shared stories from Florida residents who were quoted a few hundred dollars but hit with thousands more once their belongings were loaded, a classic bait-and-switch tactic that can devastate families financially.

What makes this coverage especially meaningful is how Agoyu’s technology is presented as a part of the solution. By using AI to analyze a video of your belongings and generate an accurate move estimate before you ever sign a contract, Agoyu helps you see what a reputable cost should be — before movers show up at your door. The app also directs users to vetted, licensed movers, complete with DOT licensing, complaint history, and inspection records, putting critical transparency into your hands.

“In markets rife with ‘fly-by-night’ operators, your best defense is avoiding scams in the first place,” the WPBF report explained, and that’s exactly what Agoyu is designed to do. By surfacing accurate pricing and clear mover credentials, Agoyu gives you the power to compare honest quotes and avoid hidden fees, so you don’t fall prey to surprise charges or questionable providers.

Moving shouldn’t be stressful or unsafe — and as this recent feature shows, tools like Agoyu are helping keep consumers informed, protected, and in control of their moving experience.

Looking for a trusted, vetted moving company to assist with your move?

Simply fill out the fields in the form below, and view mover profiles that show years in business, industry accreditations, Department of Transportation scores, and Better Business Bureau ratings.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


costs of moving company

Understanding the Costs of Hiring a Moving Company

Moving to a new home can be an exciting adventure, but it often comes with a hefty price tag. One of the biggest expenses you’ll face is hiring a moving company. Whether you’re relocating across town or across the country, understanding the costs associated with professional movers can help you budget effectively and avoid unexpected surprises.

In this comprehensive guide, we’ll break down the various factors that influence moving costs, explore different types of moving services, and provide tips on how to save money during your move. By the end, you’ll have a clear picture of what to expect when hiring a moving company and how to make the most cost-effective decisions for your specific situation.

How Much Does a Moving Company Cost?

When it comes to hiring a moving company, costs can vary widely depending on several factors. On average, you can expect to pay anywhere from $450 to $12,700 for professional moving services. This broad range reflects the diversity of moving scenarios, from small local moves to large cross-country relocations.

For a typical move, the average cost falls around $1,625. However, it’s important to note that this figure can fluctuate significantly based on the specifics of your move. Factors such as the distance of your relocation, the size of your home, the amount of belongings you’re moving, and the level of service you require all play crucial roles in determining the final price.

To give you a clearer picture of potential costs, here’s a breakdown of low, mid, and high-range moving expenses:

CostLocal Move (<100 miles)Long-Distance Move (> 100 miles)
Low$450-700$1,600-2,500
Mid$700-1,500$2,500-5,000
High$1,500-2,800$5,000-12,000+

Keep in mind that these figures are estimates, and your actual costs may fall outside these ranges depending on your specific circumstances. It’s always best to get personalized quotes from multiple moving companies to get the most accurate pricing for your situation.

Factors That Impact Costs of Moving Companies

Understanding the various elements that influence moving costs can help you anticipate expenses and potentially find ways to reduce them. Let’s explore the key factors that moving companies consider when calculating your bill.

Distance

The distance of your move is perhaps the most significant factor in determining cost. Local moves (typically defined as relocations within 100 miles) are generally cheaper than long-distance moves. This is because local moves usually require less time, fuel, and logistical planning.

For local moves, companies often charge an hourly rate for labor plus a flat fee for the truck and equipment. Long-distance moves, on the other hand, are typically priced based on the weight of your belongings and the distance they need to be transported. As you might expect, moving from New York to California will cost substantially more than moving from New York to New Jersey.

Location

Your specific location can also impact moving costs in several ways. First, the cost of living in your area affects labor rates. Moving in or out of a major metropolitan area like New York City or San Francisco will likely cost more than moving in a smaller town or rural area.

Additionally, the accessibility of your home can influence prices. If you live in a high-rise apartment or a home with narrow streets that can’t accommodate a large moving truck, the movers may need to use smaller vehicles or spend more time navigating logistical challenges. These factors can increase your overall cost.

Labor

The cost of labor is a significant component of your moving bill. Most moving companies charge between $35 and $80 per hour per mover. The number of movers required depends on the size of your home and the amount of belongings you have. A studio apartment might only need two movers for a few hours, while a four-bedroom house could require four or five movers for a full day.

Remember that labor costs don’t just cover the physical act of moving your items. They also include the time spent driving to and from your locations, as well as any time spent navigating difficult access points or assembling and disassembling furniture.

Packing

Many moving companies offer packing services as an add-on, which can significantly increase your total cost. Professional packing typically costs around $70 per hour per worker, with a minimum of three hours. While this might seem expensive, it can be a worthwhile investment if you have valuable or fragile items that require expert handling.

Here’s a rough estimate of packing costs based on home size:

  • One-bedroom apartment: $300
  • Two-bedroom apartment: $600
  • Four-bedroom house: $1,000

If you’re looking to save money, you can opt to pack your belongings yourself. However, keep in mind that items you pack yourself may not be covered by the moving company’s insurance in case of damage.

Size of Move

The size of your move, typically determined by the size of your home and the amount of belongings you have, is a crucial factor in determining cost. More items mean more time spent loading and unloading, potentially more movers needed, and a larger truck required.

Here’s a general breakdown of how home size affects local moving costs:

  • One bedroom: Average cost $450, typically requires 2 movers
  • Two bedrooms: Average cost $700, typically requires 2-3 movers
  • Three bedrooms: Average cost $1,300, typically requires 3-4 movers
  • Four bedrooms: Average cost $1,900, typically requires 4 movers
  • Five bedrooms or more: Average cost $2,900, typically requires 5 or more movers

For long-distance moves, the size of your move affects the weight of your shipment, which is a key factor in pricing. The heavier your shipment, the more expensive your move will be.

Seasonality

The time of year you choose to move can have a significant impact on your moving costs. Summer months (June through August) are typically the busiest for moving companies, as this is when many families choose to relocate while children are out of school. As a result, prices during these peak months can be 20-30% higher than during off-peak seasons.

If you have flexibility in your moving date, consider scheduling your move during the fall or winter months. Not only are prices generally lower, but you may also find it easier to book your preferred moving company and date.

Additionally, weekends and the beginning and end of each month tend to be busier (and thus more expensive) times to move. If possible, try to schedule your move for a weekday in the middle of the month to potentially save on costs.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


Types of Moving Companies

When it comes to moving, you have several options to choose from, each with its own cost implications. Understanding these different types of moving services can help you decide which option best fits your needs and budget.

Full-Service Moving Companies

Full-service movers offer the most comprehensive (and most expensive) moving experience. These companies handle every aspect of your move, including:

  • Packing all your belongings
  • Disassembling furniture
  • Loading the truck
  • Transporting your items to your new home
  • Unloading the truck
  • Unpacking your belongings
  • Reassembling furniture

While this option comes at a premium, it can be a great choice if you're short on time or physical ability, or if you have valuable items that require expert handling. Full-service moves typically cost between $2,000 and $12,000, depending on the size of your home and the distance of your move.

The main advantage of full-service movers is the convenience and peace of mind they offer. However, the high cost can be prohibitive for many people, and some may feel uncomfortable having strangers handle all their personal belongings.

Self-Service Moving Companies

Self-service moving companies offer a middle ground between full-service movers and a complete DIY move. With this option, the company provides a moving container or truck, which you load yourself. The company then transports the container or truck to your new home, where you unload it.

This option is significantly cheaper than full-service movers, typically costing between $350 and $5,000, depending on the distance of your move and the size of the container or truck you need. It's a good choice if you're willing to do the heavy lifting yourself but don't want to deal with the hassle of driving a moving truck long distance.

The main advantages of self-service moving are the cost savings compared to full-service movers and the flexibility it offers in terms of packing and loading time. However, you'll need to be prepared for the physical labor involved in loading and unloading your belongings.

DIY Moving

The most cost-effective option is to handle the entire move yourself. This typically involves renting a moving truck, which can cost anywhere from $15 to $150 per day, depending on the size of the truck and the distance of your move. You'll also need to factor in the cost of fuel, which can be substantial for long-distance moves.

DIY moving gives you complete control over your move and can save you a significant amount of money. However, it's also the most time-consuming and labor-intensive option. You'll need to pack all your belongings, load them into the truck, drive the truck to your new home (which can be challenging if you're not used to driving large vehicles), and then unload everything.

This option is best suited for those who are physically capable of handling the labor, have friends or family who can help, and are looking to save as much money as possible on their move.

Final Thoughts

Choosing a moving company and understanding the associated costs can seem overwhelming, but armed with the right information, you can make an informed decision that balances your budget with your needs.

Remember, the cheapest option isn't always the best. Consider the value of your time and the potential risks of damage to your belongings when weighing your options. Getting quotes from multiple companies can help you understand the market rates for your specific move.

Don't forget to factor in hidden costs like packing materials, insurance, and potential fees for stairs, long carries, or bulky items. These can add up quickly and catch you off guard if you're not prepared.

Lastly, regardless of which type of moving service you choose, proper planning can help keep costs down. Declutter before your move to reduce the amount of stuff you're transporting, pack efficiently to maximize space, and if possible, be flexible with your moving date to take advantage of off-peak pricing.

Moving can be stressful, but understanding the costs involved can help you budget effectively and reduce financial surprises. Whether you opt for full-service movers, a self-service option, or a DIY approach, careful planning and informed decision-making can help ensure a smooth transition to your new home.

should i hire movers

Choosing the Best Way to Move: Should I Hire Movers?

Just thinking about moving day can be enough to make your palms sweat, and put you into a state of anxiety. Whether you’re upgrading your home or downsizing it, packing up your life and hauling it somewhere new is rarely anyone’s idea of a good time. 

You’re probably struggling to decide whether you want to roll up your sleeves and tackle this monster yourself, or do you bite the bullet and let the professionals do the heavy lifting? There’s a lot to think about, and it’s not an easy call. By the time we’re done here, you’ll have a better idea of whether hiring movers is the right move for you.

Moving Yourself: Pros

Let’s start with the DIY approach. Moving yourself definitely has its upsides.

  • It’s usually cheaper. You’re not paying for labor, just the cost of a rental truck and some packing supplies.
  • You’re in complete control. Want to pack your prized action figure collection with extra bubble wrap? Go for it.
  • You set the pace and make all the decisions. If you need to take a break, no one’s stopping you.
  • There’s a sense of accomplishment that comes with moving yourself.
  • You know exactly where everything is because you packed it yourself.
  • It can be a good opportunity to declutter and organize your belongings.
  • You can be more flexible with your moving timeline.

Moving Yourself: Cons

Now, let’s get into the downsides of moving yourself.

  • It’s exhausting. Physically and mentally.
  • You’ll be lifting, carrying, and stacking for hours on end.
  • Navigating a rental truck through traffic can be stressful.
  • It takes a lot longer than you might think. You could be looking at days or even weeks of disruption.
  • There’s potential for disaster. Valuable items might get damaged if not packed properly.
  • Risk of injury. One heavy lift and you could throw out your back.
  • You need to source all your own packing materials and moving equipment.
  • You’re responsible for any damages to the rental truck.
  • It can be challenging to coordinate help from friends or family.

Hiring a Moving Company: Pros

Hiring a moving company definitely has a lot of pros. Here’s why hiring movers can make your life a whole lot easier:

  • It’s fast. Professional movers can pack up and move a whole house in a fraction of the time it would take you.
  • Movers are experts at what they do. They know how to pack fragile items and maneuver furniture.
  • Your belongings are less likely to get damaged in the hands of professionals.
  • You’re not the one lifting all those heavy boxes and furniture. Your back will thank you.
  • Many moving companies offer insurance options for added peace of mind.
  • They come with all the necessary equipment and packing materials.
  • Movers can disassemble and reassemble furniture for you.
  • It’s less stressful. You can focus on other aspects of your move.
  • Professional movers can handle long-distance moves more efficiently.

Hiring a Moving Company: Cons

Like with most things, there are still some downsides to consider:

  • Cost. Professional movers are significantly more expensive than doing it yourself.
  • You lose some control over the moving process. They have their own methods and schedules.
  • It can be nerve-wracking to watch strangers handle your belongings.
  • There’s a small risk of items getting lost in the shuffle.
  • You need to book in advance, especially during peak moving seasons.
  • Some companies may have minimum charges or additional fees for certain services.
  • You might feel pressured to tip, adding to the overall cost.
  • If the movers are delayed, it could throw off your entire moving schedule.
  • There’s potential for miscommunication about services or pricing.

Can I Hire Movers and Move Myself?

Here’s the thing – it doesn’t have to be all or nothing. You can actually combine both approaches for a best-of-both-worlds situation.

Many moving companies offer partial services. You could pack everything yourself and just hire residential movers for the heavy lifting on moving day, or you could have them pack and move everything, but you handle the unpacking. This way, you can save some money while still getting help with the toughest parts of the move.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


Should I Hire Movers? Things to Consider

Alright, so how do you actually make this decision? Here are some important things to think about before you decide if you should hire a moving company:

Time It Takes

Think about how much time you have for this move. If you're in a hurry to get out of your old place or into your new one, professional movers might be the way to go. They can often get the job done in a day, while a DIY move could take several days or even weeks.

But if you have the luxury of time and don't mind spreading the move out over a longer period, doing it yourself could work. Just be prepared for your life to be in boxes for a while.

Cost to Hire Movers

The cost of hiring movers can vary widely depending on factors like the size of your home, the distance of your move, and the services you need.

For a local move, you might be looking at anywhere from $500 to $2,000 for professional 

movers. Long-distance moves can cost several thousand dollars.

On the other hand, renting a truck and moving yourself might only cost a few hundred dollars. But remember to factor in hidden costs like packing supplies, gas, and potential time off work.

Distance of Your Move

The distance of your move matters, because you could either be moving across town or across the country. For a local move, doing it yourself might be manageable. But for a long-distance move, professional movers start to look a lot more appealing.

Driving a big rental truck for hours (or days) isn't most people's idea of fun. Plus, with a long-distance move, you have to factor in costs like hotels and meals on the road.

Packing Supplies

Don't underestimate the cost and hassle of packing supplies. Boxes, tape, bubble wrap, packing paper – it all adds up. Many moving companies include these supplies in their quote, which can be a nice perk.

If you're moving yourself, you can try to scrounge up free boxes from local stores or online marketplaces. But be prepared to spend some time hunting them down.

Packing and Unpacking

Packing is probably the most time-consuming part of any move. If you hire full-service movers, they'll handle all of this for you. They'll show up with all the supplies and pack everything carefully and efficiently.

But here's something cool: many movers can also disassemble and reassemble furniture for you so you don’t have to move it yourself. That means no struggling with allen wrenches or trying to remember how that bookshelf went together. They'll take it apart at your old place and put it back together in your new home.

Your Health

Be honest with yourself: can you physically handle moving yourself? Moving involves a lot of heavy lifting, bending, and carrying. If you have any health issues or injuries, hiring movers might be the safer choice.

Even if you're in great shape, moving is tough work. Think about whether you're willing to put your body through that stress. Remember, a thrown-out back or pulled muscle could end up costing you more in medical bills than you would have spent on movers.

Moving Yourself Vs Hiring Movers: FAQs

How far in advance should I book movers?

It's best to book movers as soon as you know your moving date. For summer moves (peak season), try to book at least 6-8 weeks in advance. For off-season moves, 4 weeks should be enough.

Do I need to be there when the movers arrive?

Yes, you or someone you trust should be present when the movers arrive and throughout the moving process. This allows you to answer any questions and ensure everything goes smoothly.

Should I tip movers?

Tipping isn't required, but it's a nice gesture if you're happy with the service. A good rule of thumb is $4-5 per hour per mover for a typical move.

What items won't movers transport?

Most moving companies have a list of items they won't move for safety or legal reasons. This typically includes hazardous materials like paint, gasoline, and propane tanks. 

They also usually won't transport perishable foods, plants, or pets. Valuable items like cash, jewelry, or important documents should be moved by you personally. Always ask your moving company for their specific list of non-allowable items.

Is it cheaper to move yourself or hire movers?

Generally, moving yourself is cheaper than hiring professional movers. Renting a truck and buying packing supplies usually costs less than paying for a full-service move. 

However, the true cost difference can vary based on factors like distance, the amount of stuff you're moving, and how you value your time and effort. 

Don't forget to factor in hidden costs of DIY moving like fuel, potential time off work, and the risk of injury or damage to your belongings. For some, the convenience and peace of mind of hiring movers outweigh the extra cost.

Final Thoughts 

If you’re still asking yourself “Should I hire movers?”, there’s no one-size-fits-all answer. It depends on your budget, timeline, physical abilities, and personal preferences.

If you have the time and energy, and you're looking to save money, moving yourself can be a good option. Just be prepared for a lot of hard work and potential stress.

On the other hand, if you value convenience and efficiency, and you have room in your budget, hiring movers can make your life a lot easier. It's especially worth considering for long-distance moves or if you have a lot of heavy furniture.

Whatever you choose, plan ahead, stay organized, and don't be afraid to ask for help. Moving is a big job, but with the right approach, you can get through it and start enjoying your new home.

Check out the Agoyu moving app today to get started planning your move.

Close-up of a vintage car's chrome headlight and front grille

Classic Car Shipping With Agoyu

For classic car enthusiasts, their vehicles are more than just a mode of transportation – they are a passion, a prized possession, and often a significant investment. When it comes to transporting these cherished automobiles, whether it’s for a move, a car show, or a sale, owners want nothing but the best in terms of safety, reliability, and care. 

This is where Agoyu comes in, revolutionizing the classic car shipping industry with its innovative app and AI-powered technology. In this article, we’ll explore the benefits of classic car shipping and how Agoyu can help you find the most qualified and trustworthy shipping companies to ensure your vehicle is protected throughout its journey.

The Power of Agoyu

Agoyu is a game-changer in the world of vehicle transportation. By harnessing the power of artificial intelligence, Agoyu simplifies the process of finding top-rated classic car shipping companies. 

The user-friendly app allows you to input your vehicle details, including the make, model, and year, along with pickup and delivery locations. Agoyu’s advanced AI algorithms then analyze this information to provide you with instant quotes from vetted and reliable classic car transporters.

One of the standout features of Agoyu is its ability to generate accurate price estimates based on real-time market data. This means you can trust that the quotes you receive are competitive and fair. Additionally, Agoyu’s AI technology takes into account the specific requirements of classic car shipping, such as the need for enclosed transport and extra care during loading and unloading. 

With Agoyu, you can have peace of mind knowing that your classic car will be matched with a transporter that specializes in handling these precious vehicles.

Benefits of Choosing a Classic Car Shipping Company

When it comes to transporting your classic car, working with a specialized car shipping company offers numerous advantages over trying to move the vehicle yourself or entrusting it to a general auto transport service. Here are some key benefits of classic car shipping:

Shipped With Extra Care

Classic car shipping companies understand the unique value and significance of these vehicles. They employ experienced and trained professionals who know how to handle classic cars with the utmost care and attention. From the moment your vehicle is picked up until it’s delivered safely at its destination, it will be treated with the respect and gentle handling it deserves. Don’t just settle for the cheapest car shipping company. 

Avoid Exposure to the Elements with Enclosed Transport

One of the most significant advantages of using a classic car shipping company is the availability of enclosed transport. Unlike open carriers that expose vehicles to the elements and potential road debris, enclosed trailers provide a secure and protected environment for your classic car. This is especially important for rare, high-value, or delicate vehicles that require extra protection from weather, dust, and other hazards.

Interstate Compliance

Transporting a vehicle across state lines involves navigating a complex web of regulations and requirements. Classic car shipping companies are well-versed in these rules and ensure that your vehicle is transported in full compliance with all applicable laws. This includes proper documentation, permits, and insurance coverage, giving you peace of mind throughout the shipping process.

Vehicle Tracking With Agoyu Portal

Agoyu takes classic car shipping to the next level with its advanced vehicle tracking capabilities. When you book your transport through Agoyu, you gain access to a dedicated portal where you can monitor your classic car’s progress in real-time. This feature allows you to stay informed and connected throughout the shipping process, providing an extra layer of transparency and reassurance.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


Dedicated Experience

Classic car shipping companies specialize in transporting these unique vehicles. They have the knowledge, expertise, and equipment necessary to ensure a smooth and safe journey for your prized possession. From understanding the specific needs of classic cars to having the right tools and techniques for secure loading and unloading, these companies are dedicated to providing the highest level of service tailored to your classic car.

Get a Vehicle Moving Quote With the Help of Agoyu

Using Agoyu to get a quote for classic car shipping is a simple and straightforward process. Start by downloading the Agoyu app on your smartphone or visiting their website. Input your vehicle details, including the make, model, year, and any specific requirements for transport. Then, provide the pickup and delivery locations, along with your preferred timeframe for shipping.

Agoyu's AI technology will instantly analyze your information and generate competitive quotes from top-rated classic car shipping companies in their network. You can review the quotes, compare prices and services, and choose the transporter that best fits your needs and budget. Agoyu's platform also allows you to book your shipment directly through the app, streamlining the entire process from quote to delivery.

With Agoyu, you can trust that your classic car will be in the hands of experienced professionals who prioritize the safety and security of your vehicle. The app's AI-powered matching system ensures that you are connected with transporters who have a proven track record of successfully shipping classic cars, giving you peace of mind throughout the entire journey.

Frequently Asked Questions About Classic Car Shipping

How much does it cost to transport a classic car?

The cost of classic car shipping depends on several factors, including the distance of the transport, the size and weight of your vehicle, and the type of transport (open or enclosed). On average, classic car shipping can range from $1 to $2 per mile for shorter distances and $0.50 to $1 per mile for longer distances. Agoyu's AI-powered app provides accurate and competitive quotes based on your specific needs, helping you find the best price for your classic car transport.

Should I ship my classic car using enclosed transport?

Enclosed transport is highly recommended for shipping classic cars. This method provides an extra layer of protection from weather, road debris, and potential hazards during transit. Enclosed trailers are typically more expensive than open carriers, but the added security and peace of mind are well worth the investment for most classic car owners. Agoyu can help you find reliable transporters that offer enclosed shipping services tailored to your classic car's needs.

What types of vehicles can I ship?

Agoyu's network of classic car shipping companies can transport a wide range of vehicles, including antique cars, vintage muscle cars, classic trucks, and even rare or exotic luxury automobiles. Whether you have a 1950s Chevrolet Bel Air or a 1960s Porsche 911, Agoyu can connect you with experienced transporters equipped to handle your specific vehicle with care and expertise.

Do I have to be present for pickup and delivery?

In most cases, you do not need to be present for the pickup or delivery of your classic car. However, it is essential to have a trusted representative available to handle the inspection and sign-off process at both ends of the transport. This person can be a family member, friend, or even a professional contact at a car show or event.

Classic car shipping is a specialized service that requires expertise, care, and attention to detail. By leveraging the power of AI technology and a network of trusted transporters, Agoyu simplifies the process of finding the best classic car shipping companies to protect your prized vehicle during transit. 

With benefits like enclosed transport, interstate compliance, real-time tracking, and dedicated experience, you can have peace of mind knowing your classic car is in the hands of professionals who understand its unique value and significance. 

Trust Agoyu to revolutionize your classic car shipping experience and ensure your cherished automobile arrives safely at its destination.

Car being driven on a rural road for long-distance transportation

What is a Driveaway Service? Auto Driveaway Services 

When it comes to moving vehicles from one location to another, there are several options available. One increasingly popular choice, especially for those embarking on a big move, is using an auto driveaway service. But what exactly is a driveaway service and how can it benefit you during your next relocation? 

In this article, we’ll dive into the details of driveaway services and explore how the innovative Agoyu app is revolutionizing the process of finding qualified car transport and moving companies.

The Power of Agoyu  

Before we get into the specifics of driveaway services, let’s take a moment to discuss Agoyu. Agoyu is a game-changing app that harnesses the power of artificial intelligence to simplify the process of finding moving services and getting accurate price quotes. 

With Agoyu, all you need to do is take a video of the items you want to move. Agoyu’s advanced AI analyzes the video and generates a detailed inventory list, including an estimated weight. This allows Agoyu to provide you with precise quotes from qualified moving companies. 

But Agoyu’s capabilities extend beyond typical moving services. The app can also connect you with top-rated auto driveaway services to transport your vehicles. By leveraging Agoyu’s technology, you can quickly find reliable and cost-effective solutions for shipping your car during a move. 

The Agoyu app takes the guesswork and hassle out of the process, ensuring you get the best service at the best price.

What is a Driveaway Service?  

A driveaway service, also known as an auto driveaway service, is a specialized transportation solution where a professional driver physically drives your vehicle from the origin to the destination. Instead of shipping your car on a truck or trailer, a driveaway service involves a driver getting behind the wheel of your vehicle and driving it to your desired location.

Driveaway services are especially popular for long-distance moves or situations where you need to transport a vehicle but are unable to drive it yourself. These services are provided by companies that employ experienced, vetted drivers who are capable of safely handling your vehicle over extended distances.

Benefits of a Driveaway Service

There are several key advantages to using an auto driveaway service for your vehicle transportation needs:

1. Faster Car Shipping: One of the primary benefits of a driveaway service is the speed at which your vehicle can be delivered. Unlike traditional car shipping methods that involve loading your vehicle onto a truck or trailer with other cars, a driveaway service transports your vehicle directly from point A to point B. This eliminates the need for multiple stops and the time associated with loading and unloading, resulting in a faster overall transport time and cheaper car shipping in the long run.

2. Delivered to Your Door: With a driveaway service, your vehicle is picked up and dropped off at the exact locations you specify. This door-to-door service is incredibly convenient, as you don’t need to worry about getting your car to or from a transportation depot or terminal. The professional driver handles all the logistics, ensuring your vehicle arrives right where you need it.

Agoyu

Scan Your Home. Get Exact Moving Costs in Minutes

Agoyu’s AI video scanning technology gives you quick, precise moving estimates. Scan your rooms, receive instant quotes from multiple vetted movers, and select the best option for you.

STEP 1 OF 3

1
Enter Move Details


3. Personalized Service: Driveaway services offer a more personalized touch compared to other car shipping methods. You have direct communication with the driver who will be transporting your vehicle, allowing you to provide any specific instructions or concerns. This level of individualized attention gives you peace of mind knowing that your vehicle is in capable hands throughout the journey.

4. Extra Protective Measures: Reputable driveaway services take extra steps to ensure the safety and security of your vehicle during transport. Drivers are thoroughly screened and trained to handle a wide range of vehicles. Additionally, many driveaway companies offer insurance coverage for your vehicle while it's in their care, providing an added layer of protection and assurance.

Get a Vehicle Moving Quote With the Help of Agoyu

If you're planning a move and need to transport your vehicle, Agoyu is your go-to resource for finding the best auto driveaway services. With its innovative AI technology, Agoyu simplifies the process of getting accurate quotes from qualified car transport companies.

Here's how it works: Start by downloading the Agoyu app and taking a video of your vehicle. Agoyu's AI will analyze the video to determine the make, model, and condition of your car. Based on this information, along with your origin and destination locations, Agoyu will provide you with competitive quotes from reputable driveaway services in your area.

Using Agoyu eliminates the need for extensive research and outreach to multiple companies. The app does the heavy lifting for you, presenting you with the best options tailored to your specific needs. With Agoyu, you can easily compare prices, read reviews, and book your chosen driveaway service directly through the app.

Don't let the stress of transporting your vehicle add to the challenges of moving. Let Agoyu and its network of trusted auto driveaway services handle the logistics for you. Download the Agoyu app today and experience the convenience and peace of mind that comes with knowing your car is in good hands during your move.

Frequently Asked Questions About Driveaway Services 

How long does it typically take for a driveaway service to transport a vehicle?

The duration of transport depends on the distance between the origin and destination. However, since driveaway services involve a driver directly transporting your vehicle without the need for multiple stops or loading/unloading, the delivery time is often faster compared to other shipping methods. Your chosen driveaway service provider can give you an estimated delivery timeframe based on your specific route.

Can I track my vehicle during the driveaway process?

Most reputable driveaway services offer vehicle tracking options, allowing you to monitor your car's progress throughout the journey which is especially important for cross-country car shipping. This may include GPS tracking, regular updates from the driver, or a combination of both. Keep in mind that Agoyu offers tracking of your shipment as well using the Agoyu portal! 

Are there any restrictions on the types of vehicles that can be transported via driveaway services?

Driveaway services can typically accommodate a wide range of vehicles, including cars, trucks, SUVs, and even classic or exotic vehicles. However, it's essential to discuss any specific requirements or concerns regarding your vehicle with the driveaway company to ensure they have the appropriate experience and equipment to handle your car safely.

What kind of insurance coverage is provided during the driveaway process?

Most driveaway services offer some form of insurance coverage for your vehicle while it's in their care. This may include liability coverage, damage protection, or even comprehensive insurance. It's crucial to clarify the specific insurance provisions with your chosen provider and understand any limitations or deductibles that may apply.